Product parameters:
Our breakthrough transformer DC resistance tester features a high-capacity lithium battery and compact design for portability. It delivers rapid, high-accuracy measurements for both inductive components (transformers, reactors) and resistive samples (conductors, switch contacts).
Technical parameters:
Direct resistance test | |||
Current gear | പരിധി അളക്കുന്നു | Current gear | പരിധി അളക്കുന്നു |
10എ | 500uΩ~200mΩ | 100mA | 10Ω~200Ω |
5എ | 10mΩ~1Ω | 10mA | 50Ω~2kΩ |
1എ | 100mΩ~20Ω | 1mA | 500Ω~50kΩ |
Technical index | |||
കൃത്യത | ±(Reading x 0.2%+2 words) | Maximum resolution | 0.1uΩ |
Conditions of use and appearance | |||
പ്രവർത്തിക്കുന്ന വൈദ്യുതി വിതരണം | Built-in lithium battery or external charger, charger input 100 ~ 240VAC, 50Hz/60Hz | ||
ചാർജ്ജിംഗ് വോൾട്ടേജ് | 16.8V | ചാർജിംഗ് കറന്റ് | ≤2A |
ചാര്ജ് ചെയ്യുന്ന സമയം | About 4 hours | Service time | More than 8 hours |
Main engine weight | 3.6kg(excluding test line) | Main engine size | 325×225×125mm3 |
സേവന താപനില | -10℃~50℃ | ആപേക്ഷിക ആർദ്രത | ≤90%, no condensation |
സവിശേഷത:
1.Dual Power Supply
Lithium battery or 220V AC adaptive input. Single charge supports 500+ transformer DC resistance tests.
2.Intelligent 10A Output
selectable currents (≤10A/25V) with auto-ranging for rapid testing.
3.Wide Range & High Accuracy
500μΩ – 50kΩ ±0.2% full-scale.
4.Resistance-Temperature Conversion
Built-in RT calculation for direct temperature analysis.
5.Comprehensive Safety Protections
Back-EMF / Open-circuit / Power-loss / Over-temperature protection with alarms.
6.Sunlight-Readable Display
5.6" industrial-grade color LCD (1000-nit brightness).
7.Printer-Ready
Supports external printers for instant reports.
8.Flexible Data Storage
Local memory + USB export capabilities.
Precautions:
Test the no-load voltage regulating winding, and it is not allowed to switch the no-load tap changer during the testing process or before discharging the power.
During the testing or discharging process, it is not allowed to remove the testing line and cut off the power switch.
During the testing of the transformer, the winding on the unmeasured side of the transformer must be open circuited.